Experimental conditions
Release time: 21:15, October 07, 2021    Author:    点击:[]

m88 com live casino register

Laboratory Overview

 

Electronic electronic energy system laboratory, with"Smart Energy and high -power energy transformation" is the core,Deep cultivation model prediction control,Relying on electronic technology,Focus on national energy strategy,Serving new and old kinetic energy conversion。Research content covers high -power wind energy、Ocean energy、hydrogen energy、Solar power generation grid -grid variables system,Energy storage bidirectional variable flow equipment,Marine Equipment and Advanced Drive System,Energy router design and control,Wide -and -band semiconductor devices and applications,Misaclated flowers and its power grid interaction,For new energy power generation and intelligent micro grid、Advanced Drive Control、Provide theoretical and technical support in the fields of integrated operation and maintenance。


1. Hardware on the ring test platform




Hardware on the ring test platform is multi -mostRT-BOXand the upper machine (oscilloscope). in,RT-BOXDisclosure of real -time controller or electric electronic circuit can be achieved。Two or moreRT-BOXTest platforms composed of composition can complete the hardware of the algorithm in the ring verification。The platform currently supports the team's new energy storage、Traffic DC Mixed Micro Network、Wind power cluster、Verification of high -power electric drive and intelligent operation and maintenance technology。


2. Electrical drive test platform




Electric driver test platform includes tested/The two frequency frequency frequency frequency frequency and motor composition。Where,The hardware test can be on the ring platformRT-BOXController or team controller control。The platform currently supports the relevant projects driven by the team leader cable and the verification work of advanced electric drive technology。


3.Wind power generation parallel grid -to -drag test platform




Wind power generation parallel grid -to -drag test platform is dragged by low -speed permanent magnet synchronous motor、Rat cage/dual -feed motor pairing platform and the original motor inverter/generator back against the back -to -back transformer composition。Where,Back -back and mesh variables can be controlled by its own DSP controller or the controller independently developed by the team (code can be automatically generated by Simulink)。The platform currently supports team wind power crew to grid to control、Verification work of related projects such as high -power electric drives。


4. Modular multi -level variable grid -connected experimental platform




Modular multi -level variable grid -connected experimental platform,It can realize the modular multi -level variables control algorithm verification。The platform can effectively support the team to engage in research and verification in the field of wind and tenderness in the field of grid -connected technology。


5.Double -source full bridge variables test platform


 



Double -source full bridge variable test platform, adopt a new typeSIC-MOSFETSwitching device,Verify dual -acting full -bridge variable control algorithm with a wide range of frequency range。strong support for research on energy storage equipment and its control for two -way flow equipment and their control。




[Close]

Copyright © 2019 www.ee.sdu.edu.cn all rights reserved. Copyright: School of Electrical Engineering, Shandong University
Tel: 0531-88392369 Fax: 0531-88392369 Shandong University Qianfoshan Campus Jinan Jingchang 10th Road No. 17923 Postcode 250061 Shandong University Xinglongshan Campus No. 125502