Laboratory Overview
Current position: Scientific Research Lab & gt; & gt;Laboratory Overview & gt; & gt;Laboratory introduction & gt; & gt;Text
m88 sports bettingLaboratory introduction
Real -time digital simulation system of Shandong University (RTDS) Laboratory in2012Starting construction in the year, cumulative fixed assets near50010,000 yuan. The configurationRTDSThe function of the traditional current transformers and voltage transformers with analog grid,It can be used for automation simulation such as the automation and power distribution automation of traditional substation; it also has a smart gridIEC61850The interface function of the standard digital substation,It can be used in the automation simulation function of smart substation。
Figure2.1 Laboratory photos
2. Laboratory function
Current useRTDSModeling and failure simulation computing carried out in the following are mainly distributed in the following areas:
• The work of fault modeling and fault simulation calculation m88 live casino gamesof intelligent distribution network
It mainly includes: various types of distributed power modeling,Smart power distribution grid to build a model,Micro grid modeling,Based on this, an electromagnetic temporary simulation was carried out in the state of failure,Get a lot of fault simulation data,To verify that the research group proposed various smart distribution network fault detection and isolation algorithm,Principles of the Protection of Relayer Protection of Micro Grid。
• High pressure、Modeling and fault simulation calculation of ultra -high voltage and high voltage grid
UseRTDSHigh pressure、Modeling and fault simulation calculation of ultra -high voltage and high voltage grid,Especially for the high -voltage grid,Establishing a simulation model of fault analysis,Simulation calculation of the changes in electrical quantitative changes in various fault conditions。
• New Principles of the Principles of Smart Substation Dation Land Land and Modeling and Simulation of Realizing Technology
UseRTDS, I did the smart substationIEC61850Modeling,A comprehensive closed -loop test was conducted on the development of the development of the station domain reserve protection device。
• High pressure、Ultra -high -pressure and UHV m88 com live casino registertransformer protection technical modeling and simulation
UseRTDS,High pressure、Ultra -high -pressure and UHV transformer Modeling,A comprehensive closed -loop test was performed on the developed longitudinal support resistance protection device prototypes.。
• distributed feeder automation and fast protection control technology modeling and simulation
UseRTDS,Modeling of distributed feeder automation and rapid protection,A comprehensive closed -loop test was performed on the developed distributed feeder automation device prototype。
• The protection technology modeling and simulation of high -voltage DC transmission lines and light -type DC transmission lines
UseRTDS,Modeling of high -voltage DC transmission lines and light DC transmission lines, respectively,A comprehensive closed -loop test was performed on the developed protection device prototype。
• Double feedback wind power crew control technical modeling and simulation
UseRTDS,Modeling of the active speed protection control strategy and frequency control strategy of the dual feed unit that considers inertial frequency adjustment,Performance testing the control algorithm mentioned。
3. The main equipment of the laboratory
(1)RTDSEquipment configuration list:
RTDSThe main equipment is mainly included2individualrackand M88 Online Live Casinointerface board card, consisting of two screens.
serial number |
Chinese list |
English list |
Quantity |
1 |
2individualrack, eachrackseparate cabinet, including the following accessories: -2OnlyPB5Process board card/rack -1OnlyGTWIFboard card/rack -DC power supply -The cooling fan system -1OnlyGTFPIboard card/rack -1Low -voltage numbersI/Ointerface panel/rack -1September cabinet(172cm x 61cm x 74cm) /rack |
TWO (2) RACK RTDS Simulator, Including: |
2 RTDS Cubic, EACH Contains 1 Rack |
2 |
PB5Process board card |
PB5 Card |
1 |
3 |
GTAOboard card |
GTAO |
3 |
4 |
GTDOboard card |
GTDO |
1 |
5 |
GTDIboard card |
GTDI |
1 |
6 |
GTNET-GSE/SVboard card |
GTNet -GSE/SV |
4 |
7 |
GTNET-PLAYBACKboard card |
GTNet -Playback |
1 |
8 |
GTSYNCboard card |
GTSYNC |
1 |
Figure2.2 RTDS screen
(2) supporting equipment
Current,RTDSSupporting equipment mainly contains power amplifier6group, consisting of three -sided screen. The model is as follows:
serial number |
Chinese list |
Quantity |
Description |
1 |
PA60BDigital simulation power amplifier |
5 |
3Road current3Road voltage |
2 |
PAC60BDigital simulation power amplifier |
1 |
3Road current |
3 |
PAC2000BDigital simulation power amplifier |
3 |
1Road current |
4 |
PAV120BDigital simulation power amplifier |
1 |
3Road voltage |
5 |
PSS02BRouter Simulation Device |
2 |
1Switch |
Figure2.3 Pteniment screen