July 25, 2024,National Development and Reform Commission、National Energy Administration、The National Data Administration jointly issued the "Action Plan to Accelerate the Construction of a New Power System (2024-2027)" (Fagai Energy [2024] No. 1128,Hereinafter referred to as the "Action Plan")。"Action Plan" proposed,Focus on 9 special actions from 2024 to 2027,Promote the construction of new power systems to achieve practical results。
The 9 special actions are actions to ensure the stability of the power system、Large-scale and high-proportion new energy export operation、High-quality development action for distribution network、Intelligent dispatch system construction action、New energy system-friendly performance improvement action、New Generation Coal Power Upgrade Action、Optimization of power system regulation capacity、Electric vehicle charging facility network expansion action、Demand-side collaborative capability improvement action。
The "Action Plan" focuses on promoting the construction of new power systems from three aspects。First, effectively implement the overall requirements for the construction of new power systems。Revolving around "clean and low carbon、Safe and abundant、Cost-effective、Supply and demand collaboration、Two-Cross Policy of Flexibility and Intelligence,Propose special actions from different angles,Coordinate and promote the coordinated development of new power systems。The second is to strive to solve key recent issues。Based on the current development stage,Focus on key areas that urgently need breakthroughs in the construction of new power systems in the near future,Clear key tasks from 2024 to 2027,Strive to achieve results as soon as possible,Serve the actual needs of the current power system transformation and development。The third is to adopt the working method of trial first。In various key areas,Choose to tackle key issues with high returns、Great potential for efficiency improvement、Lead the direction of exploration with strong effects,Play the leading role of the pilot,Solving "big problems" with "small incisions"。
National Development and Reform Commission、National Energy Administration、Link to the notice from the National Data Administration on the issuance of the "Action Plan to Accelerate the Construction of a New Power System (2024-2027)":
https://www.gov.cn/zhengce/zhengceku/202408/content_6966863.htm
The main responsible comrades of the Electric Power Department of the National Energy Administration answered reporters’ questions on the “Action Plan to Accelerate the Construction of a New Power System (2024-2027)” Link:
https://www.gov.cn/zhengce/202408/content_6966865.htm
Yang Yongping, academician of the Chinese Academy of Engineering, explains the new power system action plan
https://mp.weixin.qq.com/s/XTD9lmj4GIgmzID0rU4PNw
Liu Jizhen, academician of the Chinese Academy of Engineering, explains the new power system action plan link:
https://mp.weixin.qq.com/s/JQeqkLQP181xttuwFPQabQ
Shen Guorong, academician of the Chinese Academy of Engineering, explains the new power system action plan link:
https://mp.weixin.qq.com/s/uMljoUkUl80YO8mvNrfdcA
Attachment:
"Action Plan to Accelerate the Construction of a New Power System (2024-2027)"